<-Back to Projects

Chevron Terminal, Sihanoukville, Cambodia

Implementation period: 2023

Chevron Terminal, Sihanoukville, Cambodia

Inros Lackner (Cambodia) Co., Ltd was contracted to provided the Topographic survey services for an adjacent area for the extension of the oil terminal.

Scope:

  • Field survey.