<-Back to Projects

Wind Turbines, Mondulkiri, Cambodia

Implementation period: 2025

Wind Turbines, Mondulkiri, Cambodia

Inros Lackner (Cambodia) Co., Ltd. was engaged by the LEADER WIND ENERGY (CAMBODIA) CO., LTD. to carry out geotechnical investigations by Cone Penetration Tests (CPTu) for a Wind Turbines Project in Mondulkiri province.

The investigations were carried out in two parts.

  • Part I: Ground investigations by Cone Penetration Tests (CPTu),
  • Part II: Ground investigations by borehole exploration.

The ground investigations by Cone Penetration Testing were carried out in nine (9) locations from 12th and 14th May 2025.